return to aviation database

Aero engine management and aero engine leasing

In times of an economic downturn, when capacity is being cut and aircraft stored, it
becomes even more attractive for airlines to defer pending maintenance and just swop or lease spare engines instead. OEMs will continue to grow their engine leasing businesses as part of the total support concept.

An aero engine’s life cycle can be divided into three main stages: the financial, management and trading phases. Careful and far-sighted management is necessary to balance maintenance cost against operational risks whilst maintaining maximum asset value as the engine progresses through these different periods.


Everything is rosy during the ‘honeymoon period’, the first years of an aero engine’s
life cycle and main part of the initial financial phase. The power plant has been freshly delivered from the OEM and mated with its original operator who will generally be able to enjoy its daily faithful, revenue-creating service without
worrying much about prolonged and expensive maintenance. Premature engine removals for component deterioration should be covered by the OEM as part of its product warranty, and even foreign object damage (FOD) events might
fall under a separate insurance policy. Typically, the OEM will also make guarantees for fuel consumption, piece-part life and reliability, especially on new-generation equipment, and possibly even commit to cost per flight hour and/or flight cycle. Apart from ensuring compliance with the regulatory requirements and keeping a moderate level of technical oversight (to make sure the required maintenance and operational processes are safely and adequately working), the operator has no more engine management responsibility.
But this sweet, uncomplicated life typically comes to an end after approximately seven years; although this does depend on the type of aircraft and its utilisation. At this point the engine is taken off wing for its first scheduled maintenance shop visit. The OEM’s warranty begins to expire in individual areas, and its financial support starts to dwindle.


At this point, the operator has to take on more responsibility for the power plant’s maintenance planning in this second part of the financial phase. During this phase  operators are also analysing the best life-limited part (LLP) management philosophy.


Power-by-the-hour agreements

A power-by-the-hour (PBH) or total support agreement with the OEM or an MRO provider is one option for the operator. This would allow continued flying without assuming the responsibility of balancing maintenance costs against operational risks and determining the maintenance planning. Normally, the engines stay in the service of the initial operator as there is only limited aircraft remarketing taking place at
this point in time. The operator can pay the OEM/MRO an individually arranged, flight hour based rate for their technical support services and concentrate on its main business of providing air transport. For example, Delta TechOps’s PBH contracts usually include fleet removal forecasting, service bulletin modification and inspection recommendations, on-wing engine condition monitoring, and the development
of a maintenance programme.
However, even apparently comprehensive packages do not necessarily cover all eventualities that might concern an aircraft operator or owner. Total support and PBH agreements always carry exclusions and might not cover certain work;
FOD removal as an example. These extra-contractual maintenance events have then to be accomplished on the basis of their individual (man hour) time and material cost requirements.
In that case the operator incurs both the cost of the regular PBH/total support payments, whether any regular maintenance work has actually been done or not, as well as the individual time and material-based payments for the additional work. In order to forecast the entire MRO expenditure for an engine over a given period of time, the operator has to make an analysis of likely time and materials cost in the first place, irrespective of whether the company then decides to sign a PBH/total support contract or not. This does not mean that a PBH/total support agreement won’t still be the best option. It all depends on the engine, operator, any specifically harsh operating area or condition.
The issue often comes down to whether the operator wants to make regular payments to  PBH/total support providers for the maintenance in advance or pay for the individual events as they come along.
Some airlines don’t want to pay up front and would rather just do it as time goes by. Whatever decision is eventually made, it is of fundamental importance to get a clear understanding of the full maintenance cost that is likely to be encountered throughout the proposed service period for the engine. Although these expenditures can vary substantially between different operators and equipment, they can nevertheless be predicted with great precision over long periods of time. Analysing an engine’s remaining life cycle in light of its operational requirements and the financial objectives of its owner, if it is a leased engine, is the first step for any technical management team before determining the future maintenance plan.

 

Aero engine asset management, the management phase

This becomes increasingly important as the engine progresses from the financial phase into the management phase. By then the powerplant is between 12 and 15 years old, may have transitioned from one operator to the next, its PBH/total support contract may be expiring, and it will need to come off-wing for its second, third or fourth shop visit. All product warranty and guarantees have finally expired,
and the maintenance plan is no longer governed by the OEM’s product and repair developments.
There will be a range of alternative PMA parts and DER repairs available on the market, which will give the operator/owner some choice to tailor the future maintenance plan to its individual needs. The management phase is where most change is going to take place within an engine and its value. The management decisions made at that particular point, for a number of shop visits, is going to dictate the residual value when one gets towards the trading phase [when the engine will eventually be disassembled to serve as a parts source]. As the lessor, one is looking more into the asset value, because one is looking at the end and what one wants to do with the asset. The operator, specifically, is looking at the cost per hour, because that’s what it is all about to turn a profit.
The main factors in the assessment of an engine’s remaining life cycle, which will indicate how long the engine may be able to stay on-wing until the next shop visit, are aircraft utilisation, the status of the LLPs and their remaining flight hours/cycles, the maintenance history, and the airworthiness directive (AD) status. If the analysis is performed from an operator’s perspective who has leased the engine, the length of the proposed service period is another major determinant. External engine management consultants are typically engaged in contracts over three or five years.
Engine trend monitoring data at different power settings (usually idle, take-off and cruise) will provide a clear picture of the power plant’s current performance and what deterioration can be expected in terms of both extent and rate.
Establishing the fuel flow and exhaust gas temperature (EGT) parameters will allow the management team to outline an initial overhaul strategy. As turbine blades get older, the wear starts to cause EGT margin degradation, and the engine will very quickly move from a strong performing engine to one that operates with no EGT margin.
Once all these parameters have been determined, it becomes possible to predict which
maintenance tasks will be necessary in the future, what this will cost, what options the
operator will have to control its spending, and how this might be affected by additional, unscheduled maintenance. Forecasting and work-scoping each engine individually as a paper exercise, include all the unscheduled events that could potentially happen, lease costs, everything ... that determines the cost per hour of engine operation.
If it is a leased engine, the interests between the operator and owner are likely to diverge as indicated above. The airline might only be contractually obliged to release the engine with a certain life left on it at the end of the lease agreement. This would allow the company to minimise the workscope accordingly to reduce its costs during the lease period. On the other hand, however, the lessor will be looking at the cost of operation over the entire ownership period, which might go long beyond the original
operator’s lease agreement. The lessor will want to enhance the workscope as much as possible in order to maintain a high asset value. This would make it more attractive and marketable to other operators who might lease the engine in the future. The two parties have then to find some common ground to keep the cost per hour of the engine at a level that is acceptable for both. If the lessor demands a technical standard
that is significantly higher than what is necessary to the operator, one solution could be that the lessor makes a contribution to the maintenance cost.

 

PMA parts and DER repairs.

The use of PMA parts and DER repairs (approved by FAA or EASA), instead of the standard OEM material and processes, is clearly one, if not the, most important and powerful means to reduce engine maintenance costs. However, while their use has been widely established throughout Western Europe and North America, this is not
necessarily the case in all other regions. PMA parts can become an obstacle when trying to find a lessee for an overhauled engine, for example, in China and India — two future growth markets.
But even within the boundaries of jurisdiction of the FAA and EASA, the cheaper alternative repair materials and processes might not always pay off either. In light of the increased operational risk of using PMA parts and DER repairs, the potential cost savings might be considered much less tempting for an airline with, for example, 10 aircraft than a carrier with a fleet of 100 aircraft. The risks are calculated over a fleet of engines. So in the case of an airline with a large fleet, one can look at that risk and decide it is worth doing. But the small operator may look at it and say that for the cost savings, it’s not worth it. A major engine failure or a catastrophic event will mean then all of those savings are wiped out by one event.

 

Aero engine spares trading , the trading phase

At approximately 20 years of age, the engine enters into the trading phase, the final
part of its life cycle. By this time, the value of the entire aircraft is mainly driven by the engine value. Ironically, however, the book value of the power plant in itself is coming down so far at this point that it no longer warrants the cost for an overhaul. The engine’s technical standard and performance has been surpassed by its younger counterparts in the fleet, and possibly even by new-generation equipment that has
emerged in the meantime. Furthermore, there will be an increased number of other engines of the same type and similar age on the market, which have been phased out by other operators and have consequently brought down engine lease rates and spare part prices. Not only does it then become cheaper for the operator to swop an engine against a leased one rather than to repair or overhaul it, indeed there comes the point where the value of the individual parts and components exceed the book value of the complete engine. It is teardown time at this point and the engine will serve as a source for spare parts.
The dynamics of the trading phase are subject to the economic conditions at the time. In periods of growth, when queues before airline check-in desks and OEM sales offices are long, the service lives of older aircraft are stretched too, and consequently lease prices for older engines with some residual ‘green-time’ are stable. ‘Green-time’ is the available period during which an older engine can remain in service until its last maintenance records expire and it will be torn down. Conversely, when the industry
goes into a downturn and airlines are cutting capacity, the older, less efficient aircraft
are the first ones to stay on the ground. A good example right now is the CFM56-3 model [for 737 Classics], where there are so many spare engines available in the market that an operator may decide to run off ‘green-time’ on a leased engine as opposed to putting in $2-3m to repair the original engine.
While the deferral of maintenance and using-up of surplus engines will help to drive
older equipment permanently out of the market, it would be a short-sighted waste of material and finances to take advantage of aircraft capacity cuts in the current economic climate and apply the practice to younger equipment too. In the airline industry, economic cycles are a way of life and have a significant impact on an airline’s budget sensitivities.
The airline industry is a cash hungry business and during an economic downturn,
airlines work hard to preserve cash. This stance can make engine management very difficult, because you will need to invest in your fleet during the shop visit to make sure that you build in the goodness to obtain your engine run time and reliability plan. Airline customers who do not maintain the investment discipline during the economic downturns can expect their cost per hour and total cost to increase in future years.

return to aviation database

Return to Database
Aero Engine Leasing
Aero engine management and aero engine leasing
Aerospace composite tooling tool steels
Aerospace Composites in airline service
Aerospace connectors
Aerospace fabrications and welding
Aerospace modelling software
Aerospace Precision Waterjet Cutting & Laser Machining
Aircraft fuel systems
Aerospace electromagnatic compatibility testing
Aircraft fuel tanks and cells
Aircraft seat covers design trends
Aircraft spares and parts
Aircraft structures and the use of aerospace composites
Aluminium honeycomb core
Aviation industry in India
GPUs aircraft ground power units
Learn about helicopter gearboxes
Aircraft fuel systems in the Airbus A310 family
Aircraft fuel tanks and fuel cells repair
Business jet maintenance
CNC Machining of hardware and certificated engine replacement parts
An introduction to helicopter engines
Air charter and aircraft hire
EASA part M approved maintenance
Carbon fibre reinforced composites
Cockpit Voice Recorders CVRs and Flight Data Recorders FDRs
IPC standards electronics
Nadcap approved thermal spray coatings
Part 21 replacement aero engine parts
Turbine blades
Turbine blades repair
Ti 6Al-4V
Site Map

 

Aero Index is a fully searchable aviation/aerospace industry database.

All content including graphics text and data remain the sole property of Aero Index Ltd, (c) 1997-2008. Any attempt to steal content will result in immediate prosecution.

Privacy Policy: Any information you pass to us is strictly confidential and will only be used by this organization in the way you request.

 feed